
Secant Piles
Interlocking secant pile walls for groundwater control and earth retention.
SAEC offers 3 specialized services in Shoring Systems in the UAE
Shoring works involve the installation of temporary or permanent structures to support the sides of an excavation, preventing soil collapse and protecting both the worksite and any surrounding structures. On the dense, fast-moving construction sites typical of Abu Dhabi and the wider UAE — where deep excavations frequently sit adjacent to existing buildings, roads, and utilities — properly engineered shoring is not optional, it is fundamental to safe execution.
SAEC Foundations delivers a full range of shoring systems: secant pile walls, formed by interlocking piles, for groundwater control and earth retention in deep excavations; diaphragm walls, using reinforced concrete panels, for deep basement and metro-scale construction; and sheet piling for both temporary and permanent earth retention. For deeper excavations requiring additional stability, we install anchored shoring systems using tensioned ground anchors, widely used in high-load applications.
Every shoring solution is engineered around the specific excavation depth, soil conditions, groundwater level, and proximity to adjacent structures — factors that vary significantly across UAE construction sites. Our geotechnical and structural teams design the shoring system to match these conditions precisely, then execute installation with our own crews under continuous monitoring throughout the excavation and construction sequence.
If your project involves deep excavation, basement construction, or work near existing structures or infrastructure, SAEC Foundations has the shoring expertise to keep your site — and everything around it — safe and stable. Contact our team to discuss your excavation and shoring requirements.


Interlocking secant pile walls for groundwater control and earth retention.

Steel sheet pile installation for temporary and permanent earth retention.

A shoring method using vertical steel soldier piles with horizontal timber or concrete lagging between them, commonly used for temporary excavation support.
SAEC operates a comprehensive fleet of heavy and specialized equipment, enabling fully self-performed project execution with high efficiency and full control over quality, schedule, and cost. Our integrated approach ensures seamless delivery from concept to completion.
In-House Execution
Certified Standards
Compliance
Assurance